Working through wet ground
Groundwater was encountered in most footings deeper than two metres. We followed geotechnical advice and used lime and forming tubes during the footing works.
Property development · June 2021
Venald constructed 115 metres of stepped concrete sleeper retaining walls for a Box Hill property development. Wall heights ranged from 600 mm to 3,100 mm, with groundwater affecting most footings deeper than two metres.

Our scope
Construction approach
Groundwater was encountered in most footings deeper than two metres. We followed geotechnical advice and used lime and forming tubes during the footing works.
The wall sections stepped across the site, with heavier steel posts used for the taller sections. The completed walls were surveyed to allow for three future staircase connections.
Project photography
View the wall alignment, finishes and connections. Select a photo to see the full image.
Specifications below describe this project. Wall design, footing depth and post selection are determined for each site.
Planning a similar project? Explore our commercial retaining walls in Melbourne, concrete sleeper walls and steel fences.
Start your project with Venald
Send your site plans, wall schedule and programme. We’ll review wall heights, boundary levels, access and fencing connections with your project team.
Retaining walls · Wall and fence packages · Fences
More of our work

Apartment development
Concrete sleeper walls along both boundaries for commercial builder Amplicon.

Wetlands infrastructure
125 metres of curved wall for Streetworks at Wylies Drain Wetland.

Five-unit development
Staged boundary wall construction for Prada Homes on a sloping site.